Application Guide
How to Apply Heat Armor
Heat Armor is a two-step system — a required approved primer coat followed by ONE finish coat — applied over assessed, prepared exterior walls. Here is the full sequence from first evaluation to finished coating.
Get a Heat Armor QuoteThe complete sequence
Application guide & technical documentsSix steps. Two coats.
01
Assess the building first
Every Heat Armor project starts with a surface review. Compatible stucco, concrete, and masonry surfaces are confirmed, existing coatings and condition are evaluated, and suitability is documented before anything is ordered. A professional Thermalizr assessment adds measured surface and interior readings you can compare after the work.
02
Prepare the surface
Walls are cleaned and brought to a sound, compatible condition. Damaged coatings, cracks, and adhesion concerns are addressed before coating begins. Heat Armor is not a structural repair and not a waterproofing membrane — substrate issues are resolved first, not covered up.
03
Plan the material quantities
Heat Armor is a two-step system: one required approved primer coat, then ONE Heat Armor finish coat. One finish bucket covers approximately 500–625 sq. ft., and that same area needs approximately 2.5–3.125 gallons of primer. Actual consumption depends on substrate, texture, preparation, and application losses.
04
Apply approved primer
The dedicated approved primer is applied after preparation, at approximately 200 sq. ft. per gallon. This required step ties the system to the substrate and creates the consistent base the finish coat is designed for.
05
Apply ONE Heat Armor finish coat
The Heat Armor finish coat goes on at approximately 100–125 sq. ft. per gallon — one coat is the specified system. Confirm the manufacturer-approved film build and application limits before starting; the supplied technical sheets remain review drafts.
06
Inspect and document
The completed coating is inspected for consistent coverage, and the project is documented with dated photographs. For measured results, a follow-up Thermalizr-style observation compares after-coating surface and interior readings against the before-coating records.
The supplied application guide and Formula D TDS are technical-review drafts, not released field instructions. Confirm manufacturer approval before work. Project-specific guidance — substrates, preparation products, priming of repairs, weather conditions, and equipment — comes from the surface assessment and current technical documentation. Coverage figures are approximate planning numbers, not guaranteed yields.
The two-step system
What goes on the wall, in order
COAT 1 · REQUIRED
approved primer
One primer coat over prepared surfaces. Approximately 200 sq. ft. per gallon — plan on 2.5–3.125 gallons of primer for every finish bucket's worth of wall.
COAT 2 · ONE FINISH COAT
Heat Armor finish coat
Approximately 100–125 sq. ft. per gallon, or 500–625 sq. ft. per five-gallon bucket. The system is specified as ONE finish coat, applied at the specified spread rate.
Watch it done
Heat Armor Application Video
A full walkthrough — preparation, primer, and the finish coat — is being produced and will play right here. The overview above is not a substitute for final manufacturer-approved instructions.
Application video coming soon
This space is reserved for Tim's Heat Armor application walkthrough.
Ready for the real thing?
Questions about a specific wall? Email tim@justcoolit.com.